Product details
Bread maker machine parts plastic injection mouldingmaking
Design software |
UG, PROE, CAD, etc. |
Plastic material |
ABS, GPPS, HIPS, AS, MS, PMMA, PC, PA6, PA66, PA+GF, PVC, PP, PE, TPE, TPU, TPR, LCP, PBT, PETG, PC/ABS, POM, PPS, PC, PPE, PPO, etc. |
Surface treatment |
Polish, texture, sand blasting, chrome plating |
Mould life |
300,000-1,000,000 shots |
Delivery time |
15-45days |
Mould material |
45#, 50#, P20, H13, 718, 2738, NAK80, S136, SKD61 etc.(Hardness 35~55HRC) |
Mould base |
Standard mould base, LKM, HASCO etc. |
Cavity |
Single/multi |
Runner |
Hot/cold |
Ejection system |
Motor/hydraulic cylinder/stripping plate/angle pin, etc |
Cooling system |
|
In core baffle and in cavity plate chain drilling type cooling |
Packaging & Delivery
Packaging Details:Wooden box, or as your requirement
Port:Shenzhen
Lead Time:30-45days
Product show
Name:Bread maker machine parts plastic injection moulding
Part Material:ABS PMMA,PC,PP,PEEK,PU,PA,POM,PE,UPE,PTFE,etc.
Color:Customized
Diameter 5-1000mm,or customized
Condition In stock/Made to order
Shape As per your drawing
Certification ISO9001,SGS,Test Report,RoSH
Free Sample Available
Shape Sheet, rod, tube, gear, pulley, guide rail, and so on
Advantage One stop procurement
Packing Plastic bags,Cartons,Wodden case,Pallet,Container,ect.
Other 24 hours instant and comfortable customer service.
Shipping status notification during delivery.
Regular notification of new styles & hot selling styles.
FAQ
Q: How many molds could you make every month?
A: About 120 sets
Q: How about the largest mold you ever made
A: 2000*1600*1000mm
Q: How about the tolerance
A: Mold tolerance 0.02mm, Product 0.02mm
Q: Could you make double color injection mold
A: YES
Q: What do you need for the quotation
A: We need 2D product drawing&3D file, or specific sample with detailed explanation and mold sepcification
Q: How about the steel you usually use
A: We only use standard components form LKM,DAIDO, HASCO, DME
Q: What is your turnaround time for injection mold buiilding?
A: Usually 3-5 weeks, it also depends on mold zide and structure complexity. We can overwork for your urgent project to shorten the delivery
http://www.sunon-mould.com/